Try a smaller work limit, a faster review, or fewer blockers. Watch the same jobs move through two pipelines and see what changes.
A useful conversation.
Shared stream: 2 jobs / day · 60 days · seed 711
One seed generates the same job sizes and blocker draws in both pipelines. Changing a setting resets the view to day 0.
Paused at day 0. Play or step through the same jobs in both pipelines.
The way it works today.
WIP 16 · capacity 2 / 2 / 2 · blockers 20%
Discovery
00 / 2 worked today
Understand the work
Build
00 / 2 worked today
Make the change
Review
00 / 2 worked today
Check and finish
Finished work will appear here.
- Throughput
- 0.0jobs / day
- Cycle time
- —days
- Lead time
- —days
- Current WIP
- 0of 16
- Blocked
- 0jobs
0 admitted jobs waiting · 0 arrived · blocked work holds a WIP slot, but does not use a worker.
What happens if…
WIP 6 · capacity 2 / 2 / 2 · blockers 20%
Discovery
00 / 2 worked today
Understand the work
Build
00 / 2 worked today
Make the change
Review
00 / 2 worked today
Check and finish
Finished work will appear here.
- Throughput
- 0.0jobs / day
- Cycle time
- —days
- Lead time
- —days
- Current WIP
- 0of 6
- Blocked
- 0jobs
0 admitted jobs waiting · 0 arrived · blocked work holds a WIP slot, but does not use a worker.
Finished work, over time.
The same incoming jobs. Two different ways of making space.
| Flow measure | Baseline | Experiment |
|---|---|---|
| Completed jobs | 0 | 0 |
| Throughput (jobs / day) | 0.0 | 0.0 |
| Average cycle time (days) | — | — |
| Average lead time (days) | — | — |
| Current work in progress | 0 | 0 |
| Average work in progress | 0.0 | 0.0 |
| Jobs in queues | 0 | 0 |
| Blocked jobs | 0 | 0 |
Cycle and lead time use completed jobs only. A dash means nothing has finished yet. Queue totals include backlog and admitted waiting jobs.
Keep the experiment.
Save the numbers, settings and seed so you can explain the comparison.
Settings stay in this browser after your first edit.Exports cover day 0 through day 0. Select Complete run to export all simulated days.
READ THE SYSTEM, NOT JUST THE SCORE
More started
isn’t always more finished.
Work limits make queues visible. Extra build capacity can simply move a queue to review. A blocker can hold space even when workers are free. Change one setting, replay the same seed, and ask where the work waits.
Read The Kanban GuideWhat this model assumes
- New jobs arrive at the start of each day. Seeded work takes 1–3 days in Discovery, 2–5 in Build and 1–3 in Review.
- A global WIP limit controls admission. Once admitted, a job keeps its slot through stage queues and blockers until it finishes.
- Each available worker processes one unit of work per day. Jobs are handled in stage-entry order, then job number. Blocked jobs use no worker capacity. There is no multitasking or context-switching penalty.
- A job has one seeded interruption check before it first receives work in Build. The blocker duration includes the day it begins.
- Discovery and Build hand off on the following day. Review finishes at the end of its processing day.
- Cycle time runs from admission to completion; lead time starts at arrival. Both include the start and end day. Throughput is completed jobs divided by elapsed days. Average WIP is the mean of end-of-day counts.
This is a simplified simulation, not a forecast for your team. It leaves out dependencies, rework, priorities and human context. Use it to form a question, then check that question against real work.